Plumbing · Damac Hills, Dubai · July 2026
Plumbing Works in Damac Hills — Full Re-Pipe, Leak Repair and New Sanitaryware
The water bill doubled in two months. Nothing was visibly wet, which is the worst kind of leak.

Project at a glance
| Property | Four-bedroom villa, Damac Hills, Dubai |
|---|---|
| Scope | Leak detection, re-pipe, drainage correction, sanitaryware |
| Diagnosis | Section isolation, meter monitoring and acoustic leak survey |
| Testing | Two hours at 1.5 times working pressure before closing up |
| Making good | Waterproofing, tiling and paintwork restored to match |
| Warranty | 1 year workmanship on the replaced pipework |
The story behind this project in Damac Hills
The water bill doubled in two months and nothing in the villa was visibly wet — which is the worst kind of leak to live with.
First visit: what we walked into in Damac Hills
We isolated sections and watched the meter. The loss was on the hot supply to the master bathroom, buried in a wall chase and corroding at a fitting that had been over-tightened years earlier.
The promise we made the owner of this four-bedroom villa
We promised to find the leak before opening anything, and to open only what we had to. No exploratory demolition, no guessing, and every wall we did open made good and repainted.
The moment the project turned
The acoustic survey narrowed the leak to a 600 mm stretch of wall. We cut one neat opening, found the corroded fitting exactly where predicted, and the owner saw the difference between diagnosis and demolition.
Craftsmanship that made the difference
We replaced the run rather than patching the joint, sleeved the pipe through the chase so it can move without abrading, and pressure-tested at one and a half times working pressure for two hours before closing up. Drainage falls were corrected so the shower clears fully.
Handover day in Damac Hills
We tested every fitting, checked the meter with all outlets closed to confirm zero loss, and made good the wall and paintwork.
Plumbing scope delivered in Damac Hills
Leak detection followed by a full re-pipe of the master bathroom, re-graded drainage, pressure testing and new sanitaryware, with walls opened only where needed.
Works carried out on site
- Section isolation and meter monitoring to locate the loss
- Acoustic leak survey to pinpoint the failing run
- Minimal, targeted wall opening at the located position
- Replacement of corroded hot and cold supply lines with sleeved runs
- Drainage re-grading so the shower and floor gully clear fully
- Pressure testing at 1.5 times working pressure for two hours
- New sanitaryware, waterproofing, tiling and paint made good
Site conditions we had to design around in Damac Hills
Every property brings its own limits. These were the conditions that shaped the programme and the sequence of trades on this job.
Constraints on this project
- Hidden leak with no visible damp to guide the search
- Owner unwilling to accept exploratory demolition
- Only one bathroom offline at a time — family in residence
Standards and checks we worked to
The checks below were carried out and recorded before the work in front of them was allowed to continue.
Quality control on site
- Pipework sleeved through chases to allow movement
- Zero-loss meter check with all outlets closed at handover
- Wet area re-waterproofed before any tile was refixed
Trades used on this project
- Leak detection
- Pipe replacement
- Drainage re-grading
- Sanitaryware installation
Want the same in your property?
We survey the property, write an itemised quotation and give you a week-by-week programme before anything starts. Message us on WhatsApp or call +971 54 996 5110 to arrange a site visit anywhere in Dubai and the UAE.