Swimming Pools · Al Furjan, Dubai · January 2026
Swimming Pool Construction in Al Furjan — Skimmer Pool and Travertine Deck
Two children, one hot August, and a garden that was mostly gravel. The brief was simple: somewhere to swim before summer.

Project at a glance
| Property | Four-bedroom villa, Al Furjan, Dubai |
|---|---|
| Pool type | Reinforced concrete skimmer pool with integrated jacuzzi |
| Finish | Glass mosaic with honed travertine coping and deck |
| Plant | Sand filtration, dosing and LED lighting with an accessible plant room |
| Approvals | Dubai Municipality pool permit and community NOC |
| Warranty | 10 years structural shell, 1 year plant and workmanship |
The story behind this project in Al Furjan
Two children, one hot August, and a garden that was mostly gravel. The brief was simple — somewhere to swim before summer.
First visit: what we walked into in Al Furjan
The garden sloped away from the villa and the only drainage point sat on the wrong side of the plot. We set levels first, because a pool that fights the garden always looks like an afterthought.
The promise we made the owner of this four-bedroom villa
We promised a shell built and water-tested before a single tile was fixed, a plant room the owner could actually reach, and a deck that stays cool enough for bare feet in July.
The moment the project turned
The moment it came together was the 72-hour water test. The shell held level to the millimetre, which meant we could set the mosaic waterline course dead straight around the whole perimeter — the detail people notice without knowing why.
Craftsmanship that made the difference
Mosaic was laid from the waterline down so the joint lines stay level to the eye, and the travertine coping was bullnosed and honed on site. LED niches were set so the light washes the floor rather than glaring at swimmers.
Handover day in Al Furjan
We filled, balanced the water chemistry and walked the owner through backwashing and dosing. The children were in before we had loaded the last tools.
Swimming Pools scope delivered in Al Furjan
A new reinforced skimmer pool with mosaic finish, LED lighting and filtration plant, finished with a travertine deck that ties into the garden.
Works carried out on site
- Setting out, excavation and disposal of spoil
- Reinforced concrete shell with waterstops at all construction joints
- Cementitious waterproofing and a 72-hour water test
- Glass mosaic tiling with a level waterline course
- Skimmer, main drain, inlets and balance tank installation
- Sand filtration, dosing and LED lighting with a dedicated plant room
- Travertine coping and deck paving tied into the garden levels
Site conditions we had to design around in Al Furjan
Every property brings its own limits. These were the conditions that shaped the programme and the sequence of trades on this job.
Constraints on this project
- Narrow side access — excavation spoil removed by mini-loader
- Existing irrigation and drainage lines to be protected and re-routed
- Sloping garden requiring a new level strategy before construction
Standards and checks we worked to
The checks below were carried out and recorded before the work in front of them was allowed to continue.
Quality control on site
- Water test passed before any tiling was allowed to start
- Pool electrics bonded and protected in line with DEWA requirements
- Slip-resistant honed finish selected for the deck surface
Trades used on this project
- Pool construction
- Waterproofing
- Pool tiling
- LED lighting
- Filtration plant
- Deck paving
Want the same in your property?
We survey the property, write an itemised quotation and give you a week-by-week programme before anything starts. Message us on WhatsApp or call +971 54 996 5110 to arrange a site visit anywhere in Dubai and the UAE.